351Cleveland build>
T. Buttermore block
Image 10 of 10

Cleveland build

Phase 2, complete. The next operation is to put the block on the CNC block machine and digitize the cylinder bores and lifter bores to assure they are in the correct locations to the cam and crank centerlines. The locations will be corrected if need be.