|
351Cleveland build>
T. Buttermore block
Cleveland Build
Buttermore Block - phase 2 Block is held by the front surface, back surface and main bores during cam boring to insure the cam is straight with the mains and the proper distance from the crank.
Call McKeown Motorsport Engineering, Inc. at 301-932-9292, M - F, 10a to 6pm, Sat 10a to 3p, Eastern Time
Copyright © 2011 McKeown Motorsport Engineering, Inc. All Rights Reserved.
|